🔒 CONFIDENTIAL BLIND ORIGINATION DOSSIER · SHAREABLE BAIT EDITION (PAGE 1: STRATEGIC BRIEF)
EXACT SPV ACNs, PARCEL ADDRESSES & DIRECT MOBILES HELD BY HATTR
DEAL 04 OF 06 · ARCHETYPE B · MASTERPLANNED RESIDENTIAL VPP MICROGRID
PAGE 1 OF 2 · ORIGINATION & STRATEGY
PROJECT RANCHVIEW — 262 ha, 2,500-Home Northern Corridor Masterplan
NORTHERN METRO LGA · 261.96 ha · Up to 2,500 dwellings · 13.50 MVA engineered load (3 × 4.5 MVA stages) · Intercept: T-36 to T-12m
| Owner / Coordinator Proof |
Coordinated by PRIVATE WA DEVELOPER D across a consolidated landowner syndicate including SYNDICATE SPV D1, SYNDICATE SPV D2, and SYNDICATE SPV D3 (all verified active on the ABN/ASIC register). LSP + ASIC VERIFIED |
| Size & Dwelling Yield |
261.96 ha gross (169.04 ha net residential area across 39 parent lots) yielding up to 2,500 dwellings (~7,500 residents) — roughly 2.0× Zenith's Eglinton Village (EDL10, 1,260 lots). |
| Engineer's Load Calculation |
The structure plan's own civil engineer (CIVIL ENGINEER D) calculated 13.50 MVA (~12.15 MW) at ultimate build (5.40 kVA/dwelling diversified). Structured as three sequential 4.50 MVA (~833-home) stages, each stage sits squarely inside the ≤4 MW CMD skinny-connection sweet spot. ENGINEER REPORT VERIFIED |
| Stage & Intercept Window |
Phase 3–4 (WAPC Endorsed Subject to Modifications 23 Jul 2025 · Final Approval Pending · T-36 to T-12 Months). Federal EPBC referral covers 3 contiguous lots (15.86 ha, Jun 2026–Jul 2035). Note: Developer's 57-lot boutique estate on ADJACENT SUBURB is outside/adjacent to the main 2,400-lot precinct. |
| Adjacent Precinct 6 Bonus Intel |
Sits next to PRECINCT GAMMA (227.44 HA, ~2,482 DWELLINGS) on the same overloaded substation — where hattr recovered the unreachable S3 archive unmasking lead proponent SPV GAMMA (ACN 623 XXX XXX) and planner PLANNER GAMMA. |
THE GRID PROBLEM (WHY CONVENTIONAL WESTERN POWER SUPPLY FAILS HERE)
- The Engineer's Own 8 MVA Feeder Warning: In Section 2.1.5.3 of the structure plan, CIVIL ENGINEER D explicitly warns that the 13.5 MVA ultimate load breaches Western Power's rule that "a single dedicated feeder should only be loaded up to 8 MVA" — concluding it is "very likely that the development will require WP power network reinforcement/augmentation" after Stage 1.
- Overloaded Zone Substation Until 2030+: WANNEROO / NORTH METRO ZS (84 MVA) is forecast at 107/110/114/119% (TSP 2025) and 103/106/110/113% (2027–30) rising to 128% (2036) in Draft TSP 2026. The planned load-transfer fix has slipped from 2029 to 2030 and remains uncommitted.
- No Electrical Consultant Named Yet: The LSP lists town planner, civil engineer, environmental, bushfire, and water consultants, but zero electrical/energy partner has been appointed.
WHY A PRIVATE MICROGRID WINS HERE
- Single Coordinating Developer Across 39 Landowners: Unlike fragmented precincts where nobody has authority to sign, Qube Property Group is the single development manager coordinating Precinct 8.
- Solves the Exact Post-Stage-1 8 MVA Feeder Wall: By deploying a 2.5 MVA skinny connection + 2.5 MW / 6.0 MWh community BESS per 833-home stage, Qube can build all 2,500 homes off a single 8 MVA feeder envelope without waiting until 2030+ for Wanneroo ZS relief.
- Exact Carbon-Copy of Zenith's Eglinton Village (EDL10): Eglinton Village (86 ha, ~1,260 lots with Cedar Woods) uses a 6 MWh community BESS + orchestrated rooftop solar VPP; Precinct 8 is simply two Eglintons side-by-side (~9.7 km east of Zenith's Ocean Reef Marina EDL9).
CLOSEST ZENITH PRECEDENT
Eglinton Village (EDL10/ERL33, 86 ha, ~1,260 lots with Cedar Woods) & Ocean Reef Marina (EDL9/ERL32, ~65 ha, 4 MVA connection, 9.7 km west): Direct northern-corridor replication.
WHO TO APPROACH (VERIFIED CHANNELS)
- Coordinating Developer: Managing Director & Development Director at PRIVATE WA DEVELOPER D (DIRECT PHONE & EMAIL HELD BY HATTR).
- Servicing Report Author (Civil Engineer): Directors at CIVIL ENGINEER D (DIRECT PHONE & EMAIL HELD BY HATTR).
- Town Planner: TIER-1 WA TOWN PLANNER D (DIRECT CONTACT HELD BY HATTR).
LICENCE & REGULATORY ROUTE
EDL10/ERL33 non-contiguous licence-area amendment (per 7 Jan 2026 ERAWA precedent) or EDL9 Ocean Reef northern corridor extension.
Key Risk
Final WAPC modification sign-off is pending, and the initial 15.86 ha EPBC lot cell may already have a Stage 1 LV/HV pillar connection application in flight.
Next Step
Unlock hattr's unredacted dossier to approach PRIVATE WA DEVELOPER D and CIVIL ENGINEER D with a stage-by-stage 8 MVA feeder bridge proposal.
1 Draft LSP incl. s2.1.5.3 Engineering Servicing Report (URL REDACTED IN TEASER) · 2 Western Power TSP 2025 & Draft TSP 2026 App E (103–128% utilisation, 2030 slip) · 3 EPBC Referral 2025/REDACTED · 4 ERA EDL10/ERL33 Eglinton Grant & 7 Jan 2026 Amendment.
🔒 CONFIDENTIAL BLIND ORIGINATION DOSSIER · SHAREABLE BAIT EDITION (PAGE 2: ENGINEERING & BOO FINANCIAL MATH)
CALIBRATED TO WESTERN POWER TSP 2026 & WEM IRCR BENCHMARKS
DEAL 04 OF 06 · ENGINEERING SIZING, LOAD PHYSICS & 25/30-YR BOO MODEL
PAGE 2 OF 2 · THE MATHS WORK
PROJECT RANCHVIEW — 262 ha, 2,500-Home Northern Corridor Masterplan — Quantitative Feasibility
Calibrated to Zenith Slide 3/4 Benchmarks ($536,448.38 / 2.0 GWh = 26.82 c/kWh), Western Power 2026/27 Tariffs & WEM IRCR Credits
ESTATE SCALE
261.96 ha / 2,500 Homes
3 × ~833-Home Stages
ENGINEERED LOAD
13.50 MVA (4.5 MVA/Stg)
18.75 GWh/yr Total
FEEDER BOTTLENECK
13.5 MVA vs 8.0 MVA Cap
Wanneroo ZS 103–128%
30-YR BOO REVENUE
$154.5M Contracted
$2.30M/yr Full EBITDA
1. BOTTOM-UP ELECTRICAL LOAD & FEEDER DEFICIT DERIVATION
Step 1 — JDSi Engineering Load vs. Tom Friberg's Slide 3 Residential Benchmark
JDSi Diversified Method: 2,500 dwellings × 5.40 kVA/home = 13.50 MVA (~12.15 MW) across 3 × 4.50 MVA stages
Note: Under Zenith Slide 3's un-diversified 9.375 kVA/home ratio (15 MVA / 1,600 homes), 2,500 homes would equal 23.4 MVA — making microgrid peak-shaving even more critical.
Step 2 — How Staged Skinny Connections Beat the 8.0 MVA Feeder Rule
3 Stages × 2.50 MVA Skinny Boundary CMD = 7.50 MVA Total Feeder Draw (Staying 100% Inside Western Power's 8.0 MVA Single-Feeder Cap!)
Each 833-home stage pairs a 2.50 MVA boundary connection with a 2.50 MW / 6.00 MWh community BESS + 3.50 MWp orchestrated rooftop/precinct solar VPP.
Step 3 — Annual Estate Energy Consumption (2,500 Homes + Neighbourhood Centre)
2,500 homes × 6,500 kWh/yr (incl. EV/heat-pump electrification) + 2.50 GWh/yr commercial/POS pumping = 18.75 GWh/yr
Equivalent to 6.25 GWh/yr per 833-home stage (or 9.38 × the 2.0 GWh Slide 4 reference energy block across the full precinct).
Step 4 — Replicating Eglinton Village (EDL10) VPP & WEM Reserve Capacity Economics
3 × 2.50 MW Community BESS (7.50 MW / 18.0 MWh total) = ~$1.20M/yr in WEM IRCR Capacity Credits + Project Symphony VPP value
Homeowners receive discounted green tariff + zero solar export curtailment, while Zenith locks in 2,500 captive meters for 30 years.
2. OPTIMAL MICROGRID PLANT SIZING & DISPATCH SPECIFICATION
| Microgrid Subsystem |
Engineered Rating |
Dispatch Physics & Commercial Role |
| Boundary Connection (Per 833-Home Stage / Full) |
2.50 MVA / 7.50 MVA Total |
Fits all 2,500 homes onto a single 8.0 MVA Western Power feeder without deep augmentation |
| Orchestrated Rooftop + Precinct Solar PV |
3.50 MWp/Stg (10.5 MWp Total) |
~5 kWp per home + commercial centre roof; generates ~17.3 GWh/yr across full build |
| Community LFP Battery (Per Stage / Full) |
2.5 MW / 6.0 MWh (×3 Stages) |
Identical to Eglinton EDL10's 6 MWh battery per stage (7.5 MW / 18.0 MWh full build) |
| Local Solar + VPP Self-Sufficiency |
~52.0% Behind-the-Meter |
9.75 GWh/yr supplied via orchestrated VPP + community BESS; 9.00 GWh/yr off-peak import |
3. UNBUNDLED TARIFF & REVENUE STACK (SLIDE 4 BENCHMARK SCALED TO 18.75 GWh/yr)
| Bill Component (Slide 4) |
Share |
Unit Rate |
2.0 GWh Ref |
Full Estate (9.4x) |
How the Microgrid Captures / Displaces It |
| Variable Wholesale Energy |
37.55% |
10.01 c/kWh |
$200,224 |
$1,878,101 |
Replaced by on-site Solar PV (~45–62%) + cheap off-peak grid import |
| Western Power Network (UOS/CMD) |
30.12% |
8.03 c/kWh |
$160,606 |
$1,506,484 |
Slashed via single skinny HV boundary meter (<=3.5 MW CMD) + internal LV ring |
| Peak Capacity / WEM IRCR |
16.78% |
4.47 c/kWh |
$89,474 |
$839,266 |
Shaved during the 12 Hot-Season peak intervals + earns ~$216k/MW/yr IRCR credits |
| Market Fees & Retail Margin |
11.16% |
2.98 c/kWh |
$59,506 |
$558,166 |
Captured directly by Embedded Network / Microgrid Operator |
| Environmental Certificates (LGC/STC) |
4.39% |
1.17 c/kWh |
$23,408 |
$219,567 |
Generated on-site by behind-the-meter Solar PV array |
| TOTAL BUNDLED GRID BENCHMARK |
100.0% |
26.82 c/kWh |
$536,448 |
$6,056,250 / yr |
62.45% is Non-Energy (46.90% WP Network + IRCR alone) |
4. 25/30-YEAR BUILD-OWN-OPERATE (BOO) P&L, CAPEX & DEVELOPER SAVINGS
ANNUAL MICROGRID P&L RUN-RATE (FULL BUILD)
| Gross Bundled Grid Equivalent (18.75 GWh/yr) | $6,056,250/yr |
| Less: Customer Tariff Discount (20.0% (Resi A1 + C&I)) | −20% to −22% |
| Net Behind-the-Meter Retail + Network Revenue (~90–95%) | $4,845,000/yr |
Plus: WEM IRCR Peak Capacity & NSSS Credits (~5–10%) 5.20 MW diversified hot-season evening peak shaved across 3×6 MWh community batteries × ~$216k/MW/yr IRCR credit | +$1,125,000/yr |
| Total Addressable Microgrid Revenue | $5,970,000/yr |
Less: Off-Peak Grid Import, Skinny CMD Tariff & O&M Includes 9.00 GWh off-peak grid import, 7.5 MVA staged CMD network charges, VPP homeowner solar credits, and O&M | −$3,670,000/yr |
| NET MICROGRID EBITDA (ANNUAL RUN-RATE) | $2,300,000 / yr ($767k/yr per stage) |
CAPEX, RETURNS & DEVELOPER DEAL HOOK
Estimated Turnkey BOO CapEx Breakdown
Per 833-Home Stage: Community BESS (6.0 MWh @ $0.58M/MWh = $3.48M) + HV/LV Microgrid Switching & VPP Orchestration ($1.12M) = $4.60M/Stage ($13.80M Full 3-Stage Build; homeowner rooftop PV funded via house-and-land packages)
Project Returns & Contracted Annuity
6.0 Years Simple Payback · ~15.8% Unlevered Pre-Tax IRR · $154.5M 30-Year Contracted Revenue
Why the Developer Signs (CapEx & Time Saved)
Allows Qube Property Group to unlock all 2,500 dwellings off a single 8 MVA feeder envelope without waiting until 2030+ for Wanneroo/Joondalup substation upgrades, saving $6M–$10M in HV headworks.
1 Draft LSP incl. s2.1.5.3 Engineering Servicing Report (URL REDACTED IN TEASER) · 2 Western Power TSP 2025 & Draft TSP 2026 App E (103–128% utilisation, 2030 slip) · 3 EPBC Referral 2025/REDACTED · 4 ERA EDL10/ERL33 Eglinton Grant & 7 Jan 2026 Amendment.